Photo via NDTVRailways achieves 6.59-km tunnel breakthrough on Kedarnath and Badrinath route
In brief
Indian Railways has reported a 6.59-km tunnel breakthrough on a 125-km project in the Himalayan hills. The line is expected to improve links to the region and make travel easier for pilgrims visiting Kedarnath and Badrinath. Only one outlet has covered the news so far, and the details come from a feed summary.
A rail project in the Himalayan hills is expected to make access to two major pilgrimage sites easier, and it shows progress on infrastructure in difficult terrain.
What we know 4
Railways has reported a 6.59-km tunnel breakthrough on the project.
The project covers 125 km.
The project is expected to improve connectivity to the hill region.
Travel for pilgrims visiting Kedarnath and Badrinath is expected to become easier and faster.
How each outlet told it 1
How we got here
Construction on the 125-km rail project was under way before this breakthrough.
Railways reported a 6.59-km tunnel breakthrough on the project, according to NDTV.
What to watch
Further tunnel and construction milestones on the 125-km line
Timing of when the line is expected to open to pilgrims and other passengers